The System Settings menu contains configuration details for major system elements, including authenticators, user workstations, email notifications and more. Correct configuration of these settings is essential for successful operation of the Octopus Authenticator.



The currently selected tab of the System Settings menu is indicated by a blue line beneath the tab name. The tabs are:

  • General Settings: Contains organization details, number of permitted authenticators per user, and timeout parameters for Management Console sessions.

  • Email: Contains settings related to the mail server and system-generated notifications, including enrollment emails.

  • Authenticators: Contains a list of integrated authenticators and allows you to add customized third-party authenticators.

  • Devices: Contains settings that control handling of communications between the Octopus Authentication Server and user workstations.

  • Security: Enables creation of allowlists (based on IP ranges) for Management Console access.

  • Publish: Contains elements and features that manage and control the publishing process.

  • Audit Logs: Enables creation of configurations to integrate auditing records generated by the Octopus platform with an external SIEM solution.


General Settings


The General Settings tab contains details related to your organization as well as some other global parameters. To open the tab, select System Settings > General Settings. After updating any of the settings, click Save.


Enterprise Details are described in the table below.


EnterpriseDetails_5_2Cloud.png

Setting

Description / Notes

Organization Name

The name of your company. The name specified here is is displayed to users in the Octopus Authenticator mobile app.

Enterprise Base URL

The value should be the address of the Management Console.

Organization Logo

This logo is displayed to users in the Octopus Authenticator mobile app. By default, the setting is empty. To upload a logo, hover over the area, click Upload File and select the PNG or JPG file of your choice. Supported image size is 128x128 pixels.

Support Email

The email address to which requests for technical assistance should be sent.


The lower portion of the tab contains various general parameters.



The settings are:

  • Max Enrolled Authenticators Per User: The maximum number of mobile and FIDO devices that can be enrolled in the system for each user. Valid values can range from 1-99. Drag the slider to adjust the value.

  • Management Console Idle Timeout: The length of time (in minutes) during which no actions are performed in the Octopus Management Console before the session is automatically ended. Values can range from 2 - 60 (default is 10).

    Just before the timeout is reached, a warning popup opens, prompting the user to extend the session. If the user does not respond, the session ends automatically.

    MCLogoutWarning_Version5.png

  • Management Console Maximum Session Duration: The length of time (in hours) for which a user can continuously remain logged into the Octopus Management Console. Values can range from 1-24 (default is 3).

    When the maximum session duration is reached, the session is automatically ended, regardless of user activity. A warning popup opens one minute before the automatic logout.


  • Octopus Authenticator Failure Mode: This setting is not relevant to cloud deployments and is disabled.

Email Configuration Settings

The Email tab enables you to update settings for email notifications and manage the content of invitation (enrollment) emails sent to users. To open the tab, select System Settings > Email.



Email configuration settings are divided among the following sub-tabs:

  • Mail Server: Contains the SMTP From Name, which is the name of the sender that appears in system-generated emails. The default value is Secret Double Octopus. To update this setting, enter the name of your choice in the field and click Save.

  • Invitation Settings: Contains the Enrollment Invitation Expiration setting, which determines the maximum period of time for which an invitation email is valid. If a user does not use the invitation to enroll within this time period, the invitation is deleted from the system and a new email needs to be sent.

    The Enrollment Invitation Expiration can range from 1 hour to 3 weeks (default setting is 3 days). To update the value, specify the desired timeframe and then click Apply.


  • Invitation Templates: Enables you to customize the content of each invitation email type (Octopus, FIDO, OTP, Hardware Token, and Bypass with Token). For details, refer to Customizing Enrollment Emails (below).

Customizing Enrollment Emails


The Invitation Templates sub-tab supports creation of customized content for invitation emails. You can upload your own logo, change the default texts, use the language of your choice, and more.


To create customized invitation email templates:

  1. At the top of the Invitation Templates tab, select the relevant email template from the Invitation Type dropdown list.


  2. Make changes to the email content, using the tools and fields provided on the left side of the page. Mail Subject, Logo Image and Text Direction are common to all invitation types. The other fields may vary slightly according to the type.

    InvitationTemplateTool.png

  3. Check how your changes are presented in the Preview, on the right side of the page.

    IMPORTANT: Updates for a given field are displayed in the Preview only once you complete changes in that field and select another field.


  4. When your updates are complete, at the bottom of the page, click Save. Then, in the confirmation popup, click Save.

  5. Repeat Steps 1-4 for additional invitation types.

Several action buttons at the bottom of the Invitation Templates tab are provided to help you as you customize the template.


InvitationTemplateActionButtons.png


The options include:

  • Sample: Opens a popup window that matches the field titles (on the left side of the page) with the corresponding sections of the invitation email. For example:

    InvitationSamplePopup.png

  • Send Test Invitation: Sends the invitation email to the recipient of your choice, so it can be viewed within an actual email client. After clicking Send Test Invitation, enter the relevant email address in the field and click Send.

    SendTestInvitation.png

  • Reset: Changes all settings in the invitation template back to the original default values.

Authenticator Management

Secret Double Octopus supports the ability to authenticate to Windows, Mac and the User Portal through a primary authenticator other than Octopus Authenticator. These third-party authenticators are added by means of plugins, enabling external developers to expand built-in behavior by adding new plugins or modifying existing ones.


The following sections present details about managing authenticators:

Authenticator Plugins: Overview


Authenticator plugins, which determine the authentications method(s) and behavior of third-party authenticators, are made up of two required parts:

  • The Authenticator schema, also known as the template, is a JSON file that is uploaded to the Octopus Management Console. (For details, refer to Managing Authenticator Templates.)

  • The Authenticator code is a JS file that needs to be manually uploaded to each Authentication Server. It is recommended to store the file in a dedicated directory, so system upgrades will not interfere with existing custom authenticators.

The names of the two plugin files (JSON and JS) must be identical. In addition, the file name needs to be unique, since it serves as the identifier of the template in the system.


The Authenticators tab of the System Settings menu allows you to add, update and manage third-party authenticators, as well as upload new templates. Each authenticator you add must be based on one of the uploaded templates.



Selection of the primary mobile authenticator is done at the directory level (in the Authenticators tab of the directory settings).  


Third-party plugins currently provided out-of-the-box are:


Plugin Name

Authentication Method(s)

Function / Description

duo

Authenticator and/or OTP Validator

Enables users working in the Duo environment to authenticate by approving an authentication request on the Duo mobile app (delivered by push notification), or by providing the one-time password required by the service, which is validated by the Duo server.

forgerock

Authenticator and/or OTP Validator

Enables users working in the ForgeRock environment to authenticate by approving an authentication request on the ForgeRock mobile app (delivered by push notification), or by providing the one-time password required by the service, which is validated by the ForgeRock server.

okta

Authenticator and/or OTP Validator and/or Two-step authentication

Enables users working in the Okta environment to authenticate by approving an authentication request on the Okta mobile app (delivered by push notification), or by providing the one-time password required by the service, which is validated by the Okta server.

When the Two-step option is selected, Okta users are able to log into Windows and the Octopus User Portal with voice, SMS, passphrase or strong authentication. Users provide the code or passphrase after completing the first step of entering username and password.

The okta_v2 template features the additional capability of supporting Okta push notifications to two mobile devices simultaneously. This template can be used when multi-factor operation is enabled in the Okta platform.

ping

Authenticator and/or OTP Validator

Enables users working in the Ping Identity environment to authenticate by approving an authentication request on the PingID mobile app (delivered by push notification), or by providing the one-time password required by the service, which is validated by the PingFederate server.

Reporting Plugin

Authenticator and/or OTP Validator and/or Reporting

A Reporting authenticator is dedicated to receiving workstation authentication event logs, so log reports can be viewed in the third-party platform. To enable third-party event reporting, the relevant Reporting authenticator needs to be specified in the Authenticators tab of the directory settings.

rsa-am

OTP Validator

Enables users working with the RSA On Premise server to authenticate by providing the one-time password required by the service.

rsa

Authenticator and/or OTP Validator

Enables users working in the RSA environment to authenticate by approving an authentication request on the RSA mobile app (delivered by push notification), or by providing the one-time password required by the service, which is validated by the RSA server.

twilio_v1

Two-step OTP Authenticator

Enables users to complete authentication by providing a validation code that is sent to them by either SMS or email. The code is sent after the user has completed the first step of entering username and password.

twilio_v2

Two-step OTP Authenticator and/or Pincode Authenticator

Supports the two-step verification methods provided by the twilio_v1 plugin (SMS and email), as well as voice call and WhatsApp verification methods.

The Pincode Authenticator enables users without smartphones to perform passwordless authentication by entering a PIN code during a voice call received during the login process.

thales

Authenticator

Enables users who choose MobilePASS as the authenticator to approve push authentication requests with a single tap and generate secure one-time passcodes together with fingerprint or facial recognition.

yubico

OTP Validator

Enables users working with their own Yubikey OTP server to authenticate via OTP verification. Instead of entering the OTP, users need to simply touch the key. This automatically generates the code and sends it to the server.


Viewing the Authenticator List


The Authenticator List shows all configured authenticators and displays the name, source template, creation time (if relevant) and current connectivity status (red or green indicator) of each one. The Octopus, FIDO and Hardware OTP Authenticators are preconfigured and automatically available. Other third-party authenticators need to be added, using the templates provided.


AuthenticatorList_CardView.png


Note: The Client Certificate Authenticator is not relevant to SaaS deployments, and is therefore disabled.


If an authenticator is used in one or more directories, the DIRECTORIES list is enabled. To view the directories to which an authenticator is assigned, click to open the list. Clicking a directory name opens the settings of that directory.


AuthenticatorDirectoriesList_SAAS.png


Working with Authenticators

The options in the Actions column allow you to perform various administrative operations on authenticators. Clicking Icon_OpenActionsMenu.png opens a list with the following options:

  • Disable: Inactivates the authenticator.

  • Delete: Removes the authenticator from the Management Console. An authenticator can be deleted only if it is NOT currently assigned to any directories.

    IMPORTANT: Out-of-the-box authenticators cannot be deleted.


AuthenticatorActions_5_2.png


Clicking Icon_EditDetails.png opens a page on which you can view and update authenticator details. When updating settings for an authenticator, keep the following in mind:

  • The template cannot be changed.

  • Details for the FIDO Authenticator are not editable.

  • The authentication methods (Authenticator, OTP Validator, etc.) can be updated only if the authenticator is NOT currently assigned to any directories. When an authenticator is assigned, the Methods settings are disabled.


  • After updating authenticator details or settings, click Save.

Octopus Authenticator details (name and methods) are not editable, but several settings related to security mechanisms and management of credentials in the mobile app are configurable for this authenticator.


Note: The global configuration set here can be modified for specific mobile devices in the Authenticators tab of a user's details. 



The settings are:


Setting

Description

Default

Timeout Period

The length of time allotted for the mobile device to acknowledge receipt of a push notification from the Octopus Authentication Server. The supported timeout range is 5-60 seconds.

If the Server does not receive a confirmation message from the mobile within the specified time period, BLE mode authentication is initiated. If BLE has not been activated for the Octopus Agent, the authentication request fails.

60 seconds

Apple Watch Authentication

When enabled, users are allowed to authenticate on the watch. When disabled, users must authenticate on their mobile devices.

Enabled

Force Mobile Phone Lock

When enabled, users are required to use the locking feature on their mobile devices.

Enabled

Force Biometric Authentication

When enabled, users must provide a biometric factor (fingerprint, face recognition, etc.) to successfully authenticate. This toggle is available only when the Force Mobile Phone Lock setting is enabled.

Disabled

Detect Changes in User Biometrics

When enabled, the Octopus mobile app checks for changes in biometric data with every authentication request. If a change is detected (e.g., Face ID added), it is recorded as an auditing event.

This toggle is available only when the Force Biometric Authentication setting is enabled.

Disabled

Lock Authenticator on Biometrics Change

When a change in biometric data is detected and this setting is enabled, the mobile app blocks authentication and sends a message to the Octopus Authentication Server to disable the mobile authenticator. Users are presented with an error message, prompting them to contact their IT team. The phone can be re-enabled by the system admin in the Authenticators tab of the user details.

This toggle is available only when the Detect Changes in User Biometrics setting is enabled.

Disabled

Show Password on the Home ScreenWhen enabled, users can view the AD password directly from the Home screen of the Octopus mobile app. This setting works in conjunction with OTP verification and biometric authentication. For more information, refer to Configuring Support for Credentials Access from the Home Screen (below).Disabled

Show Credentials

When enabled, the AD password is displayed to users in the Octopus Authenticator mobile app.

Enabled

Copy Credentials

When enabled, users are able to copy the password displayed in the Octopus Authenticator app to the clipboard of the mobile device.

Enabled

Credentials Obfuscation

When this feature is activated, the mobile app is unable to decrypt the AD password, as the Authentication Server sends it to the app encrypted with the workstation's public key. (As a result, the Show Credentials and Copy Credentials settings must be disabled when using this feature.)

Credentials Obfuscation can be set to ONE of the following states:

  • Off: Credentials can be decrypted by all versions of the mobile app.

  • Enabled: Credentials can be decrypted by versions 5.4 and lower of the mobile app. This setting is useful during rollouts of version 5.5 and higher.

  • Enforced: Credentials can never be decrypted by the mobile app. Authentication will fail for users working with versions of the mobile app lower than 5.5.

Note: This feature is not currently available for Mac workstations.

Off

Enhanced Assurance Level

When this feature is activated, an extra layer of security is added to the authentication flow by requiring a BLE challenge between the app and the workstation after the user approves the push request. This challenge ensures that the user's mobile device is in close proximity to the workstation.

Enhanced Assurance Level can be set to ONE of the following states:

  • Off: A BLE challenge is not required (standard authentication flow).

  • Enabled: A BLE challenge is attempted, but if it fails the user can still successfully authenticate. This setting is useful during rollouts of mobile app version 5.5 and higher and Windows Agent version 3.8.4 and higher.

  • Enforced: A BLE challenge is always required for login. Authentication will fail for users working with versions of the mobile app lower than 5.5 and Agent versions lower than 3.8.4.

Note: This feature is not currently available for Mac workstations.

Off

Password Rotation NotificationWhen enabled, a notification message is displayed in the mobile app when the user's AD password has been rotated.Enabled
Location MapWhen enabled, authentication requests include a map of the target device's location. Enabled

Remote Audit

When enabled, audit records are sent from the mobile app to the Octopus Authentication Server.

Disabled

Mobile Device Recovery

When enabled, account recovery after migration to a new mobile device is supported.

Disabled

Device Filtering

Enables specification of mobile devices on which Octopus Authenticator can be used. For details, refer to Defining Supported Devices for Octopus Authentication (below).

Disabled
Show FileVault PasswordWhen enabled, users can view the macOS FileVault password in the Octopus Authenticator app, so they can unlock the machine at the FileVault pre-boot screen. When the setting is disabled, the FileVault password is not displayed in the mobile app.
This setting is relevant only when FileVault login is set up in Server configuration (the FileVault password is managed by the Octopus Agent).
Enabled


Configuring Support for Credentials Access from the Home Screen 


The Show Password on the Home Screen feature allows users to view the AD password directly from the Home screen of the mobile app. Since this feature is most useful for OTP authentication (which requires copying both the password and the verification code), it is available only for users who have completed OTP enrollment.


When the feature is enabled, the OTP code and the password are continuously displayed on the Home screen in masked characters. Tapping the visibility icon generates an authentication request.



Following successful biometric authentication, the OTP code and password are shown in cleartext. 



For successful use of this feature, verify that: 

  • Software OTP authentication is enabled as an authenticator in the relevant directory. (In the Authenticators tab of the directory settings, activate the Enable Online OTP toggle.)
  • Users have been sent enrollment invitations for both the Octopus Authenticator and the OTP Authenticator.
  • The following Octopus Authenticator settings are enabled: 
    • Force Biometric Authentication
    • Show Password on the Home Screen
    • Show Credentials


Defining Supported Devices for Octopus Authentication 


The Device Filtering feature enables you to specify mobile devices on which the Octopus Authenticator app is supported. You can create lists of allowed devices, prohibited devices, or both.



To add a row to the Allowed or Prohibited list, click + and enter data about the relevant device. You can define any combination of OS. Model, Manufacturer and Device Info (one string in each field). It is not necessary for all the fields to be populated.


When you are finished configuring the list(s), click Save.



While creating your lists, keep the following guidelines in mind: 

  • ALL conditions defined in a row must be fulfilled in order for the specified device to be allowed / prohibited.

  • In the event of conflicts or opposing conditions, filters defined in the Prohibited Devices list override those defined in the Allowed Devices list.

  • Defined filters affect both the enrollment and login processes. For example, if a user successfully enrolls a device that is subsequently defined as prohibited, the user will no longer be able to authenticate on that device.

  • The Device Filtering toggle determines whether defined filters are currently being enforced. When the setting is inactive, your filters are preserved, and you can continue modifying the lists while filtering is disabled.


Importing and Managing Hardware OTP Tokens

Secret Double Octopus supports use of HW OTP tokens to authenticate to Windows and the User Portal. In order for users to successfully login with HW OTP tokens, you need to:

  1. Import a list of tokens from a file (as described in the procedure below).

  2. Enable support of HW OTP tokens for online and/or offline authentication in the relevant directory.

  3. Send enrollment invitations to your users. For details about the registration process, please refer to the document Hardware OTP Enrollment and Authentication.


IMPORTANT: Users can enroll with one OTP type only (either hardware or software, but not both).


To import hardware OTP tokens:

  1. From the Authenticator List, click Icon_EditDetails.png in the card or row of the Hardware OTP Authenticator.

    Then, on the page that opens, click Import From File.

    HWOTPList_Empty.png

  2. In the popup that opens:

    a. Click Upload File. Then, navigate to and select the relevant file.

    IMPORTANT: The file must be in PSKC format. Maximum supported file size is 20 MB.


    b. If the selected file is encrypted, enter the password in the Password field. For example:

    HWOTP_ImportButton.png

  3. Click Import.

    Once the import process is complete, an import summary is displayed. For example:

    HWOTP_ImportSummary.png

  4. Continue by configuring directory settings  and inviting users to enroll.

After tokens have been successfully imported, the list of devices appears on the Hardware OTP Authenticator page. Once users have registered, enrollment information is displayed in the relevant columns. In addition, you can sort the list according to Username and perform searches for a specific username.


HWOTPListWithUsers.png

To view additional details about a given device, click Icon_MoreInfo.png in the relevant row or card.


HWOTP_MoreInfo.png

Clicking Icon_OpenActionsMenu.png in the row of a token enables you to perform the following actions on that token:

  • Unassign User: Reverses user enrollment. Following this action, the user will need to register again with a new enrollment invitation.

  • Delete: Removes the token from the system. Following this action, the token will need to be reimported.

    Note: Users must be unassigned before tokens can be deleted.


HWOTPList_Actions.png

Performing Bulk Operations on Hardware OTP Tokens

Clicking the Icon_OpenActionsMenu.png icon to the right of the Import From File button opens an actions menu from which you can enable / disable token selection.


EnableMultiselect.png


When you click Enable Multiselect, checkboxes appear next to the tokens, allowing you to select multiple tokens. Once tokens are selected, you can unassign users from the tokens, or remove the tokens from the system.


Note: Users must be unassigned before tokens can be deleted.


HWToken_BulkOperations.png


Selecting the checkbox at the top of the Actions column enables you to carry out a bulk action on all tokens on the page, or all tokens on the list.


Multiselect_SelectAll.png


When you select an action (Unassign User or Delete Tokens), you will be prompted to specify whether to apply the operation to all tokens, or only the tokens listed on the current page of the list.


ApplyMultiactionMessage.png


To hide the checkboxes and exit selection mode, click Disable Multiselect.


Adding Third-party Authenticators

All third-party authenticators must use an installed template. When creating a new authenticator, you will be prompted to select the template on which it is based. The Management Console features several built-in templates and also supports the ability to upload customized templates.


You can create multiple authenticators using the same template, according to your organizational needs. For example, you might want to have a separate authenticator dedicated to OTP authentication. The following sections explain how to add various authenticators using different template types:


Duo, ForgeRock, Okta, Ping and RSA Authenticators


Each of these plugins can be used for push notification authentication, OTP validation, or both.


Note: The Okta template can also be configured as a Two-step authenticator. For details, refer to Okta Two-Step.


To add a third-party authenticator (Duo, ForgeRock, Okta, Ping or RSA):

  1. In the upper left corner of the Authenticators tab, click Add Authenticator.

    The Add 3rd Party Authenticator dialog opens.

  2. In the Authenticator Name field, enter a friendly descriptive name for the new authenticator.

  3. From the Template dropdown list, select the template on which the authenticator will be based.

    IMPORTANT: You will not be able to change the template after you create the authenticator.

    AddAuth_RSA.png

  4. Select one or more Methods for the new authenticator:

    • Authenticator: The third party-authenticator can be used as an additional means of authentication (primary and/or secondary).

    • OTP Validator: The third party-authenticator can be used for one time password authentication (online and/or offline).

    If you do NOT want to use the new authenticator for a method, clear the relevant checkbox.

  5. Specify whether to send user credentials to the third-party authenticator by enabling or disabling the Send Credentials toggle button.

    When credentials are sent (default setting), the third-party authenticator sends back a token for the User Portal, and the Portal opens automatically upon user authentication to Windows or Mac. If credentials are not sent, no token is sent back, and users will need to manually log into the User Portal after being authenticated by the third party.

    Note: The DMZ Delegation setting is not relevant to SaaS deployments.

  6. Specify the following settings for authenticators based on Okta and RSA templates:

    • URL: Your access URL for the third-party authenticator portal

    • Token (Okta): The API token generated from your Okta portal

    • API Key (RSA): The API key generated from your RSA portal

  7. If you are using the okta_v2 template and you want to support Okta push notifications to two mobile devices simultaneously, make sure that the Okta Identity Engine and the Multi-Factor Support toggles are enabled. (In addition, verify that multi-factor operation is enabled in your Okta platform.)

    AddAuth_OktaV2.png

  8. Specify the following settings for authenticators based on Duo templates:

    • API hostname: The access URL for your Duo platform

    • Integration key: The API key (ikey) generated from your Duo Admin Panel

    • Secret key: The secret key (skey) generated from your Duo Admin Panel

  9. Specify the following settings for authenticators based on Ping templates:

    • URL: The access URL for your Ping Identity Platform

    • Journey / Tree: Name of the relevant authentication journey

    • Realm Path: Name of the realm in which the journey is located

    • Web SSO Journey: URL of the winsso journey.

    • Send Headers: When the toggle is enabled, HTML headers (IP, User-Agent, Primary-Auth-Type) are sent to Ping Identity.

    • Send ECP Server Credentials: When the toggle is enabled, Agent + Token authentication is supported. In the fields below, enter the Agent ID and password defined in your Ping environment.

    PINGAuthenticatorDetails.png

  10. Specify the following settings for authenticators based on ForgeRock templates:

    • URL: The access URL for your ForgeRock identity platform

    • Chain / Tree: Name of the relevant node in the Authentication Tree

    • Realm Path: Name of the relevant realm in the AM console

    • Web SSO Tree: URL of the winsso tree in your ForgeRock OpenAM. This tree enables automatic launching of the user’s dashboard upon user login to a Windows or Mac workstation.

    • Send Headers: When the toggle is enabled (default setting), HTML headers (IP, User-Agent, Primary-Auth-Type) are sent to the ForgeRock directory.

    ForgeRockAuthSettings.png

  11. To check the validity of your settings, click Test Connection.

  12. Click Add.

    The dialog closes, and the new authenticator is added to the Authenticator List.

RSA AM and Yubico Authenticators


These plugins can be used as OTP validators only.


To add a third-party authenticator (Yubico or RSA AM):

  1. In the upper left corner of the Authenticators tab, click Add Authenticator.

    The Add 3rd Party Authenticator dialog opens.

  2. In the Authenticator Name field, enter a friendly descriptive name for the new authenticator.

  3. From the Template dropdown list, select yubico or rsa-am.

    IMPORTANT: You will not be able to change the template after you create the authenticator.

    AddAuth_Yubico.png

  4. Specify the following settings for authenticators based on Yubico templates:

    • URL: The access URL for your Yubico OTP server.

    • Client ID and Client Secret: Copy the values generated from your Yubico server.

  5. Specify the following settings for authenticators based on RSA-AM templates:

    • Send Credentials: When this setting is enabled (default), user credentials are sent to the third-party authenticator. The third party then sends back a token for the User Portal, and the Portal opens automatically upon user authentication to Windows or Mac.

    • URL: The access URL for your RSA server.

    • Client Name and API Key: Copy the values generated from your RSA server.

    • Bypass SSL Validation: To bypass validity testing of the certificate on the RSA server, click the toggle to activate the setting. (When Bypass SSL Validation is enabled, you will be able to use a self-signed certificate.)

      Note: The DMZ Delegation setting is not relevant to SaaS deployments.

    AddAuth_RSAam_OTP.png

  6. To check the validity of your settings, click Test Connection.

  7. Click Add.

    The dialog closes, and the new authenticator is added to the Authenticator List.

Thales Authenticator


This plugin can be used for push notification authentication to Windows and the User Portal.


To add the Thales third-party authenticator:

  1. In the upper left corner of the Authenticators tab, click Add Authenticator.

    The Add 3rd Party Authenticator dialog opens.

  2. In the Authenticator Name field, enter a friendly descriptive name for the new authenticator.

  3. From the Template dropdown list, select thales.

    IMPORTANT: You will not be able to change the template after you create the authenticator.

    AddAuth_Thales.png

  4. Specify whether to send user credentials to the third-party authenticator by enabling or disabling the Send Credentials toggle button.

    When credentials are sent (default setting), the third-party authenticator sends back a token for the User Portal, and the Portal opens automatically upon user authentication to Windows or Mac. If credentials are not sent, no token is sent back, and users will need to manually log into the User Portal after being authenticated by the third party.

    Note: The DMZ Delegation setting is not relevant to SaaS deployments.

  5. Enter the URL and Encryption Key in the appropriate fields. Copy these settings from your Thales Admin Console (Authentication Processsing > Authentication Agent Settings).

  6. To check the validity of your settings, click Test Connection.

  7. Click Add.

    The dialog closes, and the new authenticator is added to the Authenticator List.

Okta Two-Step Authenticator


In a two-step authentication flow, users need to provide an additional validation code after entering their credentials. In the Okta two-step mechanism, the code is sent to the user via voice message, SMS, or the Okta Verify app. Alternatively, users can provide a passphrase that has been configured in Okta.


IMPORTANT: In order for users to be able to log into Windows, Octopus Desk for Windows version 3.6.0 or higher must be installed. 


To add an Okta Two-step authenticator:

  1. Before beginning setup in the Octopus Management Console, configure your Okta environment to support the integration.

    IMPORTANT: If you plan to use a passphrase for verification, you need to set up a custom security question called Passphrase.


    ConfiguringPassphrase.png

  2. In the upper left corner of the Authenticators tab, click Add Authenticator.

    The Add 3rd Party Authenticator dialog opens.

  3. In the Authenticator Name field, enter a friendly descriptive name for the new authenticator.

  4. From the Template dropdown list, select Okta. Then, under Methods, select Two-Step Authenticator and make sure that the Send Credentials toggle is enabled.

    AddAuth_OktaV2.png

    Note: The DMZ Delegation setting is not relevant to SaaS deployments.


  5. Enter the following settings:

    • URL: Your access URL for the Okta portal

    • Token: The API token generated from your Okta portal

    • Security Question: If you plan to use a passphrase for verification, enter Passphrase. (Make sure you have set up the security question as described above.)

  6. To check the validity of your settings, click Test Connection.

  7. Click Add.

    The dialog closes, and the new authenticator is added to the Authenticator List.

  8. To complete the integration, navigate to the settings of your integrated directory and open the Authenticators tab. Under Additional Authenticator, select the Okta authenticator you created, and under Authenticator User Mapping, select Email. Then, at the bottom of the tab, click Save.

    Okta_DirectoryConfig.png

    IMPORTANT: To help ensure successful integration, verify that user credentials (username and password) in the AD and in the Okta directory are identical.


  9. To set up integration for the User Portal, select the Portal menu and configure the following settings:

    • In the Parameters tab, under Multi-Factor Authentication, select Username + Password (MFA).

      Okta_PortalConfig.png

    • In the Directories and Users tabs, choose the relevant directory, and select groups and users to be given Portal access.

Twilio Two-Step Authenticator


In a two-step authentication flow, users need to provide an additional validation code after entering their credentials. The Octopus platform provides two plugins that support Twilio two-step authentication:

  • twilio_v1: Supports verification methods of Email and SMS.

  • twilio_v2: Supports verification methods of Email, SMS, Voice Call and WhatsApp. You can select any combination of methods when creating or updating the authenticator.

    TwoStepVerificationChannels.png


The following procedure describes how to add a twilio_v2 plugin. The twilio_v1 configuration parameters for email and SMS verification are similar.


To add a Twilio Two-step authenticator:

  1. In the upper left corner of the Authenticators tab, click Add Authenticator.

    The Add 3rd Party Authenticator dialog opens.

  2. In the Authenticator Name field, enter a friendly descriptive name for the new authenticator.

  3. From the Template dropdown list, select twilio_v2.

    IMPORTANT: You will not be able to change the template after you create the authenticator.


    Then, under Methods, select the Two-Step Authenticator checkbox.

    The Verification Channels list appears.

    Note: The DMZ Delegation setting is not relevant to SaaS deployments.


  4. Open the Verification Channels list and select the verification methods to be supported. Then, configure the relevant settings for each selected method, as described in the steps below.

  5. If you selected SMS, Voice and/or WhatsApp, enter the following settings under Auth Config:

    • Account SID: The username for your Twilio account.

    • Auth Token: The password for your Twilio account.

    AuthConfigSettings.png

  6. To enable verification codes to be sent by SMS, configure the following settings under SMS Config:

    • From Phone Number: The Twilio phone number used to send the message.

    • SMS Code Length: Number of digits in the one-time code.

    • SMS Code Expiration: Time period (in seconds) for which the code can be used.

    • Text Verification Message: Content of the message. Use the %v placeholder to show the verification code in the message.

    ConfigSettings_SMS.png

  7. To enable verification codes to be sent by email, configure the following settings under Email Config:

    • Email Code Length: Number of digits in the one-time code.

    • Email Code Expiration: Time period (in seconds) for which the code can be used.

    • Text Verification Message: Content of the message. Use the %v placeholder to show the verification code in the message.

    • SMTP Host: IP address or hostname of the SMTP server.

    • SMTP Port: Port number for SMTP connection.

    • From Address: The From email address that appears in account-generated emails.

    • From Name: Name of the sender that appears in account-generated emails.

    • Mail Subject: Subject line that appears in account-generated emails.

    • SMTP Authentication: To use SMTP authentication, click the toggle button to activate the setting, and then enter the authentication username and password in the fields below.

    • SMTP Security: Select the appropriate security method: None, SSL/TLS or STARTTLS.

    ConfigSettings_Email.png

  8. To enable verification codes to be sent by voice call, configure the following settings under Voice Config:

    • From Phone Number: The Twilio phone number used to make voice calls.

    • Call Code Length: Number of digits in the one-time code.

    • Call Code Expiration: Time period (in seconds) for which the code can be used.

    • Voice call Verification Message: The message played during the call. The message should include a placeholder (%v) for the code.

    • Voice call language: The language code of the message. For a list of language codes, refer to the TTS article in the Twilio documentation.

    ConfigSettings_Voice.png

  9. To enable verification codes to be sent by WhatsApp, configure the following settings under WhatsApp Config:

    • WhatsApp from number: The Twilio WhatsApp phone number used to send or make voice calls.

    • WhatsApp Content Template Sid: The Twilio template SID for sending pre-approved WhatsApp messages. The plugin will replace the variable {{1}} with the verification code.

    • WhatsApp Code Length: Number of digits in the one-time code.

    • WhatsApp Code Expiration: Time period (in seconds) for which the code can be used.


    ConfigSettings_WhatsApp.png

    IMPORTANT: The WhatsApp verification method is currently supported for User Portal login only (not Windows).

  10. To check the validity of your settings, click Test Connection.

  11. Click Add.

    The dialog closes, and the new authenticator is added to the Authenticator List.

Twilio Pincode Authenticator


The Pincode Authenticator enables users without smartphones to perform passwordless authentication using a personal PIN for identification. On the Login screen, users select the Octopus Authenticator login method, type a username and press <Enter>. They then receive a voice call, during which they enter the PIN that was generated for them in the Octopus Management Console (in the Security tab of the user details).


Upon providing the correct PIN followed by the pound key, users are logged into Windows or the User Portal.


IMPORTANT: For successful creation and integration of the Pincode Authenticator, the Twilio environment needs to be configured to enable storage of user PIN codes. For details, please refer to the document Configuring Twilio for Octopus Pincode Authentication, or contact the Secret Double Octopus support team.


To add a Twilio Pincode Authenticator:

  1. In the upper left corner of the Authenticators tab, click Add Authenticator.

    The Add 3rd Party Authenticator dialog opens.

  2. In the Authenticator Name field, enter a friendly descriptive name for the new authenticator.

  3. From the Template dropdown list, select twilio_v2.

    IMPORTANT: You will not be able to change the template after you create the authenticator.

  4. Under Methods, select the Pincode Authenticator checkbox. Then, under Auth Config, enter the following settings:

    • Account SID: The username for your Twilio account.

    • Auth Token: The password for your Twilio account.

    AddTwilioV2Auth.png

    Note: The DMZ Delegation setting is not relevant to SaaS deployments.

  5. Under Pincode authentication config, configure the following settings:

    • Caller Phone Number: The source phone number configured in your Twilio account.

    • Instruction Message: The message that users will hear during the call.

    • No Input Message: The message that is played when no user response is detected.

    • Language: The language code of the message. For a list of language codes, refer to the TTS article in the Twilio documentation.

    • Input Timeout: Duration (in seconds) to wait for input before ending the call.

    • Sync Service ID: SID of the relevant Sync Service in the Twilio environment.

    • PIN Save Function URL: The URL of the function created in the Twilio environment to store user-entered PINs.

    PincodeAuthConfigurationStgs.png

  6. To check the validity of your settings, click Test Connection.

  7. Click Add.

    The dialog closes, and the new authenticator is added to the Authenticator List.

  8. To complete the integration, navigate to the settings of your integrated directory and open the Authenticators tab. Under Additional Authenticator, select the twilio_v2 authenticator you created. Then, at the bottom of the tab, click Save.

    AdditionalAuthPincode.png

  9. To set up integration for the User Portal, open the Portal menu.

    In the Directories and Users tabs, choose the relevant directory, and select groups and users to be given Portal access.

Generating User PIN Codes


Follow these steps to generate the PIN that the user provides during pincode authentication:

  1. From the Manage Users menu, expand the required directory. Then, select the relevant user to open the user details.

  2. In the Personal tab, verify that the user's phone number is entered in the Telephone Number / Mobile field. or mapped to an Alias parameter.

  3. Open the Security tab. Under Voicecall Authentication PIN, click Generate PIN.

    The generated code is displayed in a popup window.

    PINCodeGenerated.png

  4. Copy the code and share it with the user.

If you encounter issues while generating the PIN, perform the following troubleshooting techniques and then try again:

  • Delete any existing authenticators or devices that the user has.

  • Unenroll the user.

Managing Authenticator Templates

Template files, which are written in JSON format, contain the schema for third-party authenticators used in the system. The Octopus Management Console features several built-in templates and supports the ability to upload customized template files.


The Templates tab allows you to view and manage existing templates and upload new ones.


Working with the Templates List


Each block or row in the Templates tab shows the file name and creation time of the template. If a template is being used by one or more authenticators, the INSTANCES list is enabled.


TemplatesTab_v6_7.png


To view the authenticators currently using the template, click to open the list. Clicking an authenticator in the list opens the settings page for that authenticator.


InstancesList.png


Clicking PREVIEW opens a popup in which you can view the template's fields. The Template Preview popup contains two views:

  • Template: Shows the fields as they will be displayed in the Octopus Management Console (e.g., when creating a new authenticator based on the template).

    Preview_Template.png

  • JSON: Shows the structure of the JSON file.

    Preview_JSON.png

    IMPORTANT: Fields in the Template Preview popup are NOT editable.

Clicking Icon_OpenActionsMenu.png opens a list with the following actions:

  • Download: Downloads the JSON file to the user's local machine. Use the Download option for backup and to create new customized files based on a built-in template.

  • Delete: Removes the template from the Management Console. A template can be deleted only if it is NOT currently being used by an authenticator.

TemplateActions_6_7.png

Uploading a Template File


Custom authenticator templates can be imported to the Management Console by uploading the relevant JSON file.


IMPORTANT: Before uploading the file, make sure that the corresponding JS file (containing the authenticator code) has been copied to the Custom Authenticators directory on each Authentication Server. The names of the JSON file and the JS file must be identical.


To upload a template file:

  1. In the upper left corner of the Templates tab, click Upload Template.

    The Upload Authenticator Template dialog opens.

    UploadTemplate_1.png

  2. Click Upload Template. Then, navigate to and select the relevant JSON file.

    The name of the selected file is displayed.

    UploadTemplate_6_7.png

  3. To view the template's fields before uploading the file, click Preview. The Template Preview popup allows you to both view the fields as they will appear in the Management Console interface and review the structure of the JSON file.

  4. Click Upload.

    The template is added to the list in the Templates tab.

Modifying a Built-in Plugin


External developers can expand on built-in behavior by modifying an out-of-the-box plugin.


To modify a built-in plugin:

  1. Access the required files:

    • Export the JSON file from the Octopus Management Console.

    • Copy the JS file from the Custom Authenticators directory on the Authentication Server.

  2. Modify the two files as required. Verify that all variables used in the code are defined in the schema (JSON file).

  3. Rename the files with the same file name. The name cannot be one that is being used by one of the built-in templates.

  4. Manually upload the modified JS file to the Custom Authenticators directory on each Authentication Server. The new file will override any existing authenticator with the same name.

  5. Upload the JSON file to the Octopus Management Console, using the interface in the Templates tab.

Managing Workstation and Browser Settings

The Devices tab of the System Settings menu allows you to control the following security settings related to the workstations, browsers and devices used for authentication:

  • Workstation Limit: When this setting is enabled, you can restrict the number of workstations to which users can successfully authenticate.

  • QR Code Authentication: When this setting is enabled, users can log into the User Portal and web applications using a QR code.

  • Adaptive Authentication: When this feature is enabled, a stronger authentication mechanism is required for users logging in for the first time via a workstation or browser not previously used for Octopus Authentication.

  • Workstation Push Fatigue Protection: When this feature is enabled, you can configure protective mechanisms to be automatically enforced in the event of a suspected push bombing attack.

  • Distributed Workstations Vault settings: Allow you to manage security keys, control support of legacy workstations, and exit Compatibility Mode when you are ready to switch to a decentralized vault configuration.

  • macOS FileVault Password settings: Allow you to configure settings related to the Octopus FileVault password (relevant for Octopus for Mac versions 2.6.1 and above).

  • MDM Settings: When the MDM Enrollment feature is enabled, Octopus Authenticator enrollment can be done only for mobile devices managed by an MDM solution.


Workstation Limit Per User


This setting enables you to define a limit on the number of workstations to which users can authenticate. Once the limit is reached, authentication to any other workstation(s) will fail.


To define the limit, click the toggle to enable the setting. Then specify the permitted number of workstations in the field to the right.



After making your changes, click Save.


Note: The global limit set here can be overridden for individual users in the user's details (Security tab).



QR Code Authentication


When this setting is enabled, users have the option of authenticating to the User Portal and web services using a QR code displayed on the Login page for the service. Users logging in from workstations scan the QR code with their enrolled mobile devices. Users working on their mobile devices can tap the QR code to generate a push notification from Octopus Authenticator. They then approve the authentication request to access the required service.



Users who are unable to scan the code (e.g., the phone is not available or the camera is defective) can click the Other login options link to access alternative authentication methods.



IMPORTANT: Services that support QR code authentication include all SAML services, Entra ID, WS-Fed and OIDC services.

QR code authentication is NOT currently supported for Windows and Mac login.


To activate the setting, click the Enable QR Code Authentication toggle button. Then, click Save.



Note: The global setting defined here can be overridden for individual services, in the Devices tab of the service settings.


Adaptive Authentication Settings


Adaptive Authentication provides an extra layer of security when authentication is attempted from a workstation or browser not previously used for Octopus Authentication. When Adaptive Authentication is enabled, users authenticating for the first time from a unrecognized device (browser/workstation) are required to enter the verification code that is generated and displayed in the Octopus Authenticator mobile app. Following the first successful authentication, you can either designate the browser or workstation as a Trusted device (strong authentication is no longer required), or you can specify a frequency at which users are required to enter a code again.


To further enhance security, the Adaptive Authentication mechanism enforces the following limitations on login attempts:

  • Windows login: Users can enter the verification code only once. If the code is incorrect, authentication will fail and the entire authentication process needs to be restarted.

  • Portal login: Users are allowed multiple attempts to enter the verification code. However, after three incorrect attempts the system will not permit a user to authenticate (regardless of whether the correct code is provided on later attempts) until a new authentication request is initiated.


IMPORTANT: Adaptive Authentication is relevant to the Octopus Authenticator only.


The feature is activated and inactivated by toggling the Adaptive Authentication toggle button.



When Adaptive Authentication is active, the following settings are enabled and configurable:

  • Enforce Adaptive Authentication: This setting determines whether the Adaptive Authentication mechanism will apply to users authenticating with versions of Octopus Authenticator lower than 5.0. When the setting is off, users with previous versions of Windows, Mac or Exchange agent will be able to authenticate from an unrecognized device without entering a challenge code. When the setting is on, authentication will fail, and these users will need to upgrade to the newest version in order to successfully authenticate.

    To activate Enforce Adaptive Authentication, click the toggle button and then click Continue in the confirmation popup.

    EnforceAAWarning.png

  • Challenge Code Length: Number of characters in the verification code. Valid values range from 3-8. The default value is 4.

  • Challenge Message: The message displayed to users prompting them to enter the verification code.

  • Workstation Trust Expiration: Determines how often Adaptive Authentication is required following the first successful login to a workstation. The options are: 

  • Never: The workstation is a Trusted device and strong authentication is no longer required.

  • Always: Users receive a verification code with every login to the workstation.

  • After: Adaptive Authentication is required periodically. When selecting this option, specify the expiration period in the fields to the right.


    Note: The Browser Trust Timeout setting is configured in the General tab of the Portal menu. 


After updated Adaptive Authentication settings, click Save.


Note: The global settings defined here can be overridden for individual services, in the Devices tab of the service settings. The option to override the global Workstation Trust Expiration setting is available for Active Directory Authentication services only.


Workstation Push Fatigue Protection

This feature provides an extra layer of protection for workstations targeted for push bombing attacks. When the feature is enabled, mechanisms to protect the workstation are automatically initiated when the system detects a potential push bombing event. These mechanisms are selected by the system admin, and can be configured to become more forceful as the evidence of an attempted attack increases.


Push fatigue protection is activated and disabled by means of the Workstation Push Fatigue Protection toggle button.


PushFatigueSettings.png


When push fatigue protection is enabled, you can set up one or both of the following protection mechanisms:

  • Apply Adaptive Authentication: This mechanism works by requiring the user to provide a verification code for successful login (even when the workstation is a known device). Adaptive Authentication is applied after a specified number of timeouts (the user does not respond to the authentication request) and/or a specified number of user rejections (the user denies the authentication request).

    IMPORTANT: To use this mechanism, the Adaptive Authentication setting must be enabled.

  • Block Workstation for User: This mechanism works by preventing the user from accessing the workstation for a configurable period of time. The block is applied after a specified number of timeouts and/or a specified number of user rejections. In addition, if Adaptive Authentication is enabled, workstation access can be denied following a specified number of adaptive challenge failures (the user provides an incorrect verification code).


The following settings are also configurable:

  • Reset Push Fatigue Counters: The period of time (starting from the last failed /timed out authentication attempt) after which counters for timeouts, rejections and adaptive challenge failures are reset to zero. The counters are automatically reset upon a successful user login. Supported settings range from 1 minute to 48 hours (default is 15 minutes).

  • Workstation Block Period: The period that must elapse (from the time of user lockout) before the user is authorized to log into the workstation. Supported settings range from 1 minute to 48 hours (default is 15 minutes).


After updating Push Fatigue settings, scroll to the bottom of the tab and click Save.


IMPORTANT

  • In new installations of Octopus Authentication Server versions 5.4 and higher, push fatigue protection is enabled by default.
  • When upgrading the system to these versions, the feature is disabled, to avoid interruptions in login flows. After upgrade, you can enable the feature manually.
    Following a server upgrade, users must perform a hard refresh to the browser (Ctrl + F5), or clear the browser cache.


Distributed Workstations Vault Settings


The Distributed Workstations Vault Settings enable you to control how communications and workstation-server communications are handled. The settings are:


Setting

Description

Number of Previous Passwords Stored

The number of generated passwords stored by the server for each workstation, for authentication when the user is outside of the network. Valid values range from 16-256 (default = 64).

Minimum Supported ADPA Version

This setting enables you to choose the level of security hardening for ADPA client-server communication. The options are V1 (legacy workstation Agent support), V2 (new workstation Agent support only) and V3 (ADPA with signed payload only). 

In Compatibility Mode (default Server mode), older versions of the Octopus Authenticator app and workstation Agents are supported, and any ADPA version can be selected. When Compatibility Mode is OFF, only versions V2 and V3 are supported. If the selected ADPA version is V1 when Compatibility Mode is turned off, the version is automatically updated to V2. (For more details about Compatibility Mode, refer to the section below.)

The global setting defined here can be overridden for specific Active Directory Authentication services, in the Devices tab of the service settings. 

Reset All Workstations

This action deletes the history and security keys on all user workstations. (The workstations will then generate a new public key when the users next log in.)

The Reset All Workstations option is generally used following a system upgrade to Windows Agent version 3.3 or Mac Agent version 2.3.0.



Understanding Compatibility Mode

In the newest versions of the Octopus mobile app and Octopus workstation agents, the Octopus Server operates using the decentralized vault concept. In this configuration, the Server continues to encrypt and store the passwords. However, since the corresponding private key is stored on the device / workstation, the Server is not able to decrypt the password. Decryption can occur only on the endpoint itself.


The decentralized vault model provides an extra layer of security, and it is the best practice method of operation. However, by default, the Server works in Compatibility Mode, to support older versions of the mobile app and workstation agents.


The action of turning off Compatibility Mode cannot be reversed. Before exiting Compatibility Mode, it is very important to properly prepare, using the following guidelines:

  • Make sure that all clients are updated with these versions:

    • Octopus Desk for Windows 3.6.0 or higher

    • Octopus Desk for Mac 2.6.1 or higher

    • Octopus Authenticator App for iOS / Android 5.0 or higher

  • Verify that you are not using Octopus features that require Compatibility Mode, such as:

    • LDAP services

    • Octopus Exchange Agent

    • Components (e.g., third-party authenticators) that are configured with the Send Credentials option

To turn off Compatibility Mode:

  1. After verifying that you have met all requirements described above, click the Compatibility Mode toggle to inactivate the feature.

    A warning popup opens.

    CompatibilityModeWarning.png

  2. Click Continue.

    The Authentication Server(s) will temporarily disconnect during the migration process. Once Compatibility Mode is off, the Reset All Workstations action is disabled.

  3. If you use the Windows Agent and work with the Password Free Experience, follow these steps to enable successful authentication when Compatibility Mode is off:

    a. From the Directories menu, open the settings of the relevant directory by clicking the Edit icon.

    b. Select the Policy tab. At the top of the page, enable the Password-Free Experience  toggle.


    c. Click Save.

    Note: When Compatibility Mode is OFF and the Windows Agent is working in MFA mode, the Show Credentials feature of the Octopus mobile app may display password history incorrectly. The last (current) password is still accurate.


macOS FileVault Password Settings

In the latest versions of Octopus Desk for Mac (2.6.1 and above), the FileVault password (which is required for passwordless authentication) is managed by the Octopus Server, instead of by the endpoint. The FileVault Password Settings enable you to manage settings related to this password.


FileVaultPWSettings.png

The settings are:

  • Password Length: Number of characters in the password (4-20).

  • Password Age: Period of time before the password expires. The maximum supported value is one year. If you enter a value of 0, the system will NOT rotate the password, and the password will never expire on the Octopus Server.

  • Special Chars: Determines whether the password must include special characters.

  • Alphanumeric: Determines whether the password must include both letters and numbers.


MDM Settings


When the Enforce MDM Enrollment feature is enabled, Octopus Authenticator enrollment can be done only for mobile devices managed by an MDM solution. To implement the feature, the Client ID and MDM enrollment key need to be added to the mobile app configuration in your organization's MDM platform.



When activating this feature, keep in mind that MDM enrollment will be enforced for new enrollments only.


To activate MDM enrollment: 

  1. Enable the Enforce MDM Enrollment toggle button.

  2. Click Generate to create the MDM enrollment key. Then, click Save.


  3. Copy the Client ID and MDM enrollment key to use when configuring your MDM platform.

  4. In your MDM solution, navigate to the Octopus Authenticator app configuration and add the value of the Client ID and the MDM key to the configuration profile:

    iOS: Add the parameters of  clientId and mdmKey in Apple Property List (PLIST) format.

    For example:


    Android: Add the key-value pairs for client_id and mdm_key to the JSON file.

    For example:


Regenerating the MDM Enrollment Key


The Regenerate button enables you to regenerate the MDM enrollment key when required. After regeneration, the new key is used for new enrollments only. (Previously enrolled devices are not affected.)


If you have users who received the Octopus Authenticator app (via MDM) but have not yet enrolled, you will need to redeploy the app to their devices after performing key regeneration.


To regenerate the MDM enrollment key: 

  1. At the bottom of the Devices tab (System Settings menu), click Regenerate.

  2. In the confirmation popup that opens, click Regenerate.


  3. Click Save


Configuring Allowlists for MC Access

The Security tab enables tighter control over access to the Octopus Management Console by allowing you to specify IP ranges (in CIDR format) that are permitted to access the MC. Up to 256 IP ranges can be defined.



To configure allowlists for MC access:

  1. At the top of the Security tab, click the toggle to activate the Enable IP allowlist setting.

  2. By default, the Allow access to Double Octopus Support setting is also activated. When this setting is enabled, IPs of the SDO support team are automatically included in your allowlists to facilitate quick and effective troubleshooting.

    If you prefer to exclude SDO support IPs, make sure this toggle is NOT enabled. 

  3. Click Add IP Range. Then, in the new row that appears in the table below, enter the relevant CIDR and a description for that IP range.


  4. Repeat Step 3 to create additional allowed IP ranges.

     
  5. When you are finished configuring the allowlists, click Save.


Publishing Changes to the Database

After updating and saving settings in the Management Console, you need to publish to the database in order to update all servers with the changes you made. The Management Console offers several elements and features to help you manage and control the publishing process. The following sections describe:


The Toolbar PUBLISH Element


The PUBLISH element at the top of the Management Console shows the current status of database publication. In its default state, when there are no changes to be published, the element appears as follows:


PublishElement_v5_2Cloud.png


While you are working in the Management Console you may see the following different states of the PUBLISH element:


State

Description

PublishElement_PublishAlert.png

There are <n> unpublished changes. Publishing will update all servers with the changes.  To publish, click the PUBLISH element and then, in the confirmation popup, click Publish.

PublishChangesDialog_Version5.png

Note: After performing the User Publish action, an alert icon will continue to appear on the PUBLISH element until a full publish is done.

PublishElement_Publishing.png

Changes are currently being published. Once changes are successfully published, the PUBLISH element returns to its default state.

PublishElement_PublishIssues.png

The publishing process was unsuccessful. Click the warning icon to open a list of issues that were encountered.

Publishing is disabled. For more information, refer to Working with Publish Settings (below).

The system is in a restored state. For more information, refer to Restoring the System to a Previous State.


Working with Publish Settings


The Publish Settings in the Publish tab of the System Settings menu allow you to force publish (by clicking the PUBLISH button) and disable / enable the publishing operation.



When publishing is disabled, you may continue to update settings in the Management Console, but the changes cannot be published until the publishing operation is reactivated.


To disable publishing:

  1. At the top of the Publish tab, click Disable Publish.

    A confirmation popup opens.

    DisablePublishConfirm_Version5.png

  2. Click Disable.

    The PUBLISH button is disabled, and an alert icon appears next to the PUBLISH element in the toolbar.


  3. To reactivate the publishing operation, click ENABLE PUBLISH. Then, to publish accumulated changes, click PUBLISH.

Setting a Publishing Schedule


The Configuration sub-tab allows you to set a schedule specifying days and times when all changes are automatically published to the database.


To set a publishing schedule:

  1. From the Configuration sub-tab of the Publish tab, click the Enable Publish Schedule toggle button.

    EnablePublishScheduleToggle.png

    The Schedule options below are enabled.

  2. Specify the day(s) on which you want automatic publishing to take place by selecting the relevant checkbox(es).

  3. Specify the time(s) at which the publish operation will take place:

    • To add a time, click Icon_AddScheduledTime.png.

    • To remove a time, click Icon_RemoveScheduledTime.png.

    • To edit an existing time, click the hour, minute or AM/PM value and enter a new value.

      PublishSchedule_Version5.png

      Alternatively, click the Clock icon and then select a new time from the time picker that opens.

      EditTime_TimePicker.png

  4. When you are finished setting the schedule, click Save.


You may discontinue automatic publishing at any time. However, keep in mind that when automatic publishing is stopped, the schedule is not saved and you will need to recreate one if you resume automatic publishing.


To discontinue automatic publishing:

  1. Click the Enable Publish Schedule toggle, and then click Save.

    A warning popup opens.

    DCAutoPublishWarning.png

  2. From the popup, click Save.


Viewing Your Publishing History


The History sub-tab of the Publish tab displays a list of publish operations that have taken place and the initiator of each operation (system, username, etc.). The publish operation that reflects the current state of the database is indicated by a Icon_Active.png icon in the Active column.


By default, the Publish Details pane displays a list of all currently unpublished changes. Clicking a row in the Publish History list changes the display to list all changes included in the selected publish operation.


PublishHistoryTab_6_6_2.png

To view more details about an action in the Publish Details list, click Icon_Details.png.


ShowPublishDetails.png

Restoring the System to a Previous Publish State

Generally, the most recent publish operation is the one that is currently Active. However, if required (e.g., you inadvertently published unsuitable changes) you can restore a previous publish operation, so the system can continue to operate smoothly.


Keep in mind that restoring a previous publish state changes the content in the database, but it does not reverse any changes made in the Management Console. Therefore, after performing a Restore operation, you need to manually make relevant changes and updates in the Management Console and then publish those changes.


To restore to a previous publish state:

  1. From the Publish History list, in the row of the publish operation that you want to restore, click Icon_OpenActionsMenu.png and select Restore.

    PublishRestoreAction_v6_4.png

    A confirmation popup opens.

    RestoreWarning_Version5.png

  2. Click Restore.

    The selected publish operation is marked as the Active one, and an alert icon appears next to the toolbar PUBLISH element.


  3. Make the necessary changes in the Management Console. Then, navigate to System Settings > Publish and click the PUBLISH button.

    A confirmation popup opens.

    RestoreAndPublishChanges_V5.png

  4. To publish your changes and exit Restore mode, click Publish.

Managing External SIEM Configurations

The Audit Logs tab allows you to add configurations for integrating the auditing records generated by the Octopus platform with the SIEM solution used by your organization. Every SIEM configuration is based on a specific connection type (TCP, UDP, etc.), enabling integration with a wide variety of SIEM systems. SIEM configurations also support several output codecs , so you can select the format that best matches your requirements.


Once a configuration is set up, active and connected, every audit record generated in the Octopus Management Console is immediately transmitted to the specified SIEM server.


Working with the SIEM Configurations List

The SIEM Configurations list displays all configurations that have been added and provides basic information, such as creation date and current connection state, about each one.



Clicking Icon_OpenActionsMenu.png in the Actions column enables you to perform the following operations on a configuration:

  • Disable: Temporarily inactivates the configuration. The row of a disabled configuration is grayed out.

  • Delete: Removes the configuration from the system.

SIEMConfigActionsList.png

Clicking Icon_Edit.png in the row of a configuration opens another page where you can review and update its settings. All details are editable except Connection Type.



Adding SIEM Configurations

Adding a new configuration involves selecting the connection type, specifying connection details, and choosing an output format. The workflow varies slightly depending on the configuration's connection type (UDP, TCP or HTTP).


UDP


To add a UDP-based SIEM configuration:

  1. At the top of the Audit Logs tab, click Add Configuration.

    The New SIEM Configuration page opens.

  2. At the top of the page, enter a name for the configuration. Then, from the Connection Type dropdown list, select UDP.

    IMPORTANT: You will NOT be able to change the connection type after adding the configuration.


    NewSIEM_UDP.png

  3. Optionally, change the default text in the Description field.

  4. In the Host and Port fields, enter the IP address and the listening port used by your SIEM server.

  5. From the Output Codec dropdown list, select an output format. Supported codecs are JSON (Single Document), JSON Lines (Streaming), Plain Text and Line-Oriented Text.

  6. At the lower right corner of the page, click Save.

TCP


To add a TCP-based SIEM configuration:

  1. At the top of the Audit Logs tab, click Add Configuration.

    The New SIEM Configuration page opens.

  2. At the top of the page, enter a name for the configuration. Then, from the Connection Type dropdown list, select TCP.

    IMPORTANT: You will NOT be able to change the connection type after adding the configuration.

    NewSIEM_TCP.png

  3. Optionally, change the default text in the Description field.

  4. Configure the following required settings:

    • Host: The IP address of your SIEM server

    • Port: The listening port used by the SIEM server

  5. To use a secured connection, click the SSL Enable toggle to activate the setting.

    Then, paste the required data (SSL certificate, key and passphrase) into the fields below.

  6. To enable certificate verification, click the Verify Server Certificate toggle to activate the setting.

    Then paste the content of the SSL CA Certificate in the field below.

  7. From the Output Codec dropdown list, select an output format. Supported codecs are JSON (Single Document), JSON Lines (Streaming), Plain Text and Line-Oriented Text.

  8. At the lower right corner of the page, click Save.

HTTP


To add an HTTP-based SIEM configuration:

  1. At the top of the Audit Logs tab, click Add Configuration.

    The New SIEM Configuration page opens.

  2. At the top of the page, enter a name for the configuration. Then, from the Connection Type dropdown list, select HTTP.

    IMPORTANT: You will NOT be able to change the connection type after adding the configuration.

    NewSIEM_HTTP.png

  3. Optionally, change the default text in the Description field.

  4. In the URL field, enter the complete URL of your SIEM server, including the port. For example: http://35.222.135.199:2008

  5. From the HTTP Method dropdown list, select the relevant method.

  6. To add a header, click and then enter the required content in the field. You may add as many headers as required.

    HTTP_AddHeader.png

  7. To use a secured connection (HTTPS), paste the required data (CA Certificate, Client Certificate and Client Key) in the appropriate fields.

  8. From the Output Codec dropdown list, select an output format. Supported codecs are JSON (Single Document), JSON Lines (Streaming), Plain Text and Line-Oriented Text.

  9. At the lower right corner of the page, click Save.

S3


To add an S3-based SIEM configuration:

  1. At the top of the Audit Logs tab, click Add Configuration.

    The New SIEM Configuration page opens.

  2. At the top of the page, enter a name for the configuration. Then, from the Connection Type dropdown list, select S3.

    IMPORTANT: You will NOT be able to change the connection type after adding the configuration.


  3. Optionally, change the default text in the Description field.

  4. In the Bucket field, enter the name of the relevant bucket in Amazon S3.

  5. In the relevant Key fields, enter the access key and secret access key used for authentication to your AWS account.

  6. In the Region field, enter the AWS region where your bucket is stored, using lowercase letters only.

  7. Optionally, in the Prefix field, enter a prefix for the path within the bucket to which the audit files are uploaded.

  8. Configure settings for file upload:

    File Size: The maximum size a file can reach (in MB) before being uploaded to your SIEM solution. The supported range is 1- 1024 (default = 5 MB).

    File Rotation Time: The frequency (in minutes) at which files are uploaded. The supported range is 1 -1440 (default = 15 minutes).


    Files are uploaded whenever either of these requirements is met.

  9. From the Output Codec dropdown list, select an output format. Supported codecs are JSON (Single Document), JSON Lines (Streaming), Plain Text and Line-Oriented Text.

  10. At the lower right corner of the page, click Save

Footer - Secret Double Octopus